TECHNICAL SPECIFICATION
1 No : 300 mm dia main drum duly hard chrome plated & grinded
1 No. Metering roller duly hard chrome plated & grinded
The above 2 rollers shall be made out of steel pipes having sufficient wall thickness .
A sliding arrangement with a coating tray & width adjusting stopper , with 3 Nos. Aluminium rollers . All the above assemblies shall be mounted on the proper frame structure along with the base
Drying Tunnel
Drying Tunnel : 50 Ft Length
Drying Tunnel made out of M.S. Fabricated.
The 50 Ft length tunnel divided in 5 parts of 10 Ft each.
Tunnel have sufficient no. of 3 Inch Dia Aluminum Rollers
Web aligner 3 Nos. 3 X 0.5 HP = 1.5 HP Load
UNWIND WITH WEB GUIDE AND TENSION CONTROL
REWIND WITH AC VERIABLE DRIVE
HEATING SYSTEM
ELECTRICAL / HOT AIR